KOMS EUROPE

Key Projects Completed

Project Name / Client Hengham EPCIC Project / IOOC
Region Middle East
Project 3 Wellhead (WHP1, WHP2, WHP3)Platforms Topside EPCIC /Subsea pipe/Cable laying
Scope of Work The Basic & Detailed Engineering, procurement and fabrication, installation, pre-commissioning & commissioning 
Infield pipe lines (14” x 4.2 Km)
Two rounds submarine composite cable(power, control, fiber optic) from offshore to onshore facilities (70Km)
Project Name / Client FY-A LQ Platform Project / IOOC
Region Middle East
Project Living Quarter Topside Module
Scope of Work Engineering
Procurement
Fabrication
Onshore Comissioning
Load Out & Transportation
Project Name / Client Khalij-E-FARS FSU / Samsung C&T
Region Middle East
Project FSU Transportation and Installation
Scope of Work Installation Engineering for the FSU
Preparation of Installation procedure, drawing and documents
Towing of FSU from STX yard in Dalian, China to Persian Gulf
Mobilisation & Demobilisation of required marine spread
Positioning of FSU, Hook-up of 8 mooring chains
As-Built survey of mooring lines
Flexible Riser System:-
Complete design of the replacement riser system
Procurement
Installation
Final testing and Commissioning
Project Name / Client Khalij-E-FARS FSU / Samsung C&T
Region Middle East
Project FSU Comissioning, Startup, Operations & Maintenance
Scope of Work Remain Punch Clearance (187ea)
Metering System Repair & Commissioning
FSU Offshore Commissioning & Start-up
Operation team Management (Onshore / Offshore)
Supply of Project Support Vessel (PSV)
Oil Spill Recovery Service 
Provision of required Diver team
Project Name / Client 230kv Cable Lay Project / LS Cable
Region Venezuela
Project 230kv Submarine Cable Interconnection Between Margarta and Chacopata Project
Scope of Work Acquire DP1 vessel and convert to DP2 Cable Lay Vessel
Submarine cable shipment
Submarine cable laying (32km x 2 lines, Onshore to Onshore) Cable Landing
CPPP (Crossing Point Post Protection)
NSB (Near Shore Burial)
Project Name / Client HL5000 Crane Barge Repair & Modification / DOT-SADRA
Region Middle East
Project HL-5000 Crane Barge Repair, Reconstruction and Modification
Scope of Work Engineering 
Procurement and Fabrication
Assembly and Installation
Load Testing and Commissioning
Training and Supervision
Project Name / Client JWB-252 Jack-up Barge Repair / JWB
Region Middle East
Project JWB-252 Jack up Barge
Scope of Work Dry Dock and General Service
Blasting and Coating including Paint material
Plant and Steel Works
Valves and Piping Renewal
Provision of main and spare parts
Deck Accommodation
Project Name / Client LNG Import Terminal Project Bahrain / GS Construction
Region Middle East
Project LNG Import Terminal
Scope of Work Transportation & Installation of  Regasification Platform Topside
1 x Pipe line / 2 x Subsea Power Cable (4.6km)
EPCI for Regasification Platform Jacket
Project Name / Client TASDID SPM Replacement Project / TASDID
Region Middel East
Project Design Fabricate and Supply Single Point Mooring
Scope of Work New SPM, design and fabricate 
Mooring Chains with Anchors
Mooring Hawsers
Floating Houses
Project Name / Client Arzanah Decom Offshore-Onshore Facilities / ZADCO
Region Middle East
Project Arazanah Complex Decomissioning
Scope of Work Purchase & Removal of  Decommissioned Offshore/Onshore Facilities 
Project Name / Client Foroozan & C9-C15 Platform SMR / IOOC
Region Middle East
Project Platfrom SMR Initiative
Scope of Work Site Survey : 3D dimension check to be performed
Engineering services for SMR operation
Supply of equipment and materials for SMR
Fabrication/Installation for SMR operation
Provision of AS-Built documents and engineering dossiers
Project Name / Client Salman IRM / IOOC
Region Middle East
Project 9 Platform( Q/1, Q/2, PP/1, PP/2, DP/P, F/P , NP/P, NG/P, SK1) & 12Bridge(B1~B12) Topside Repair
Scope of Work Document review
Site Survey : 3D dimension check to be performed
Engineering services for Complex Repair
Supply of equipment and materials
Mechanical Repair and Replace
Sandblasting
Painting and Splash zone coating
Insulation
Inspection, Testing, and Reporting
Provision of AS-Built documents and engineering dossiers
Project Name / Client Salman Gas Revamping /IOOC
Region Middle East
Project Topsides’ Equipment & Facilities of Gas Utilities, Gas Processing Platform, Accommodation Platform, Gas Wellhead Platform, Oil Gathering Platform, Gas Lift Platform, Sirri Island Facilities, Mubarak Platform
Scope of Work Engineering Endorsement
Procurement
Installation and Pre-Commissioning
Commissioning and Start-up of Gas Processing
Project Name / Client Removal of 5 wrecks in Khor-e-Musa / TideWater
Region Middle East
Project Removal of 5 sunken wrecks
Scope of Work Mobilization and Demobilization of Manpower, Equipment & Marine Spread
Pre-Underwater Survey
Diesel Fuel & Lube Oil Recovery
Wreck Removal
Post Underwater Survey
5 ship/wrecks Transportation