KOMS EUROPE
Project Name / Client | Hengham EPCIC Project / IOOC |
---|---|
Region | Middle East |
Project | 3 Wellhead (WHP1, WHP2, WHP3)Platforms Topside EPCIC /Subsea pipe/Cable laying |
Scope of Work | The Basic & Detailed Engineering, procurement and fabrication, installation, pre-commissioning & commissioning Infield pipe lines (14” x 4.2 Km) Two rounds submarine composite cable(power, control, fiber optic) from offshore to onshore facilities (70Km) |
Project Name / Client | FY-A LQ Platform Project / IOOC |
---|---|
Region | Middle East |
Project | Living Quarter Topside Module |
Scope of Work | Engineering Procurement Fabrication Onshore Comissioning Load Out & Transportation |
Project Name / Client | Khalij-E-FARS FSU / Samsung C&T |
---|---|
Region | Middle East |
Project | FSU Transportation and Installation |
Scope of Work | Installation Engineering for the FSU Preparation of Installation procedure, drawing and documents Towing of FSU from STX yard in Dalian, China to Persian Gulf Mobilisation & Demobilisation of required marine spread Positioning of FSU, Hook-up of 8 mooring chains As-Built survey of mooring lines Flexible Riser System:- Complete design of the replacement riser system Procurement Installation Final testing and Commissioning |
Project Name / Client | Khalij-E-FARS FSU / Samsung C&T |
---|---|
Region | Middle East |
Project | FSU Comissioning, Startup, Operations & Maintenance |
Scope of Work | Remain Punch Clearance (187ea) Metering System Repair & Commissioning FSU Offshore Commissioning & Start-up Operation team Management (Onshore / Offshore) Supply of Project Support Vessel (PSV) Oil Spill Recovery Service Provision of required Diver team |
Project Name / Client | 230kv Cable Lay Project / LS Cable |
---|---|
Region | Venezuela |
Project | 230kv Submarine Cable Interconnection Between Margarta and Chacopata Project |
Scope of Work | Acquire DP1 vessel and convert to DP2 Cable Lay Vessel Submarine cable shipment Submarine cable laying (32km x 2 lines, Onshore to Onshore) Cable Landing CPPP (Crossing Point Post Protection) NSB (Near Shore Burial) |
Project Name / Client | HL5000 Crane Barge Repair & Modification / DOT-SADRA |
---|---|
Region | Middle East |
Project | HL-5000 Crane Barge Repair, Reconstruction and Modification |
Scope of Work | Engineering Procurement and Fabrication Assembly and Installation Load Testing and Commissioning Training and Supervision |
Project Name / Client | JWB-252 Jack-up Barge Repair / JWB |
---|---|
Region | Middle East |
Project | JWB-252 Jack up Barge |
Scope of Work | Dry Dock and General Service Blasting and Coating including Paint material Plant and Steel Works Valves and Piping Renewal Provision of main and spare parts Deck Accommodation |
Project Name / Client | LNG Import Terminal Project Bahrain / GS Construction |
---|---|
Region | Middle East |
Project | LNG Import Terminal |
Scope of Work | Transportation & Installation of Regasification Platform Topside 1 x Pipe line / 2 x Subsea Power Cable (4.6km) EPCI for Regasification Platform Jacket |
Project Name / Client | TASDID SPM Replacement Project / TASDID |
---|---|
Region | Middel East |
Project | Design Fabricate and Supply Single Point Mooring |
Scope of Work | New SPM, design and fabricate Mooring Chains with Anchors Mooring Hawsers Floating Houses |
Project Name / Client | Arzanah Decom Offshore-Onshore Facilities / ZADCO |
---|---|
Region | Middle East |
Project | Arazanah Complex Decomissioning |
Scope of Work | Purchase & Removal of
Decommissioned Offshore/Onshore Facilities |
Project Name / Client | Foroozan & C9-C15 Platform SMR / IOOC |
---|---|
Region | Middle East |
Project | Platfrom SMR Initiative |
Scope of Work | Site Survey : 3D dimension check to be performed Engineering services for SMR operation Supply of equipment and materials for SMR Fabrication/Installation for SMR operation Provision of AS-Built documents and engineering dossiers |
Project Name / Client | Salman IRM / IOOC |
---|---|
Region | Middle East |
Project | 9 Platform( Q/1, Q/2, PP/1, PP/2, DP/P, F/P , NP/P, NG/P, SK1) & 12Bridge(B1~B12) Topside Repair |
Scope of Work | Document review Site Survey : 3D dimension check to be performed Engineering services for Complex Repair Supply of equipment and materials Mechanical Repair and Replace Sandblasting Painting and Splash zone coating Insulation Inspection, Testing, and Reporting Provision of AS-Built documents and engineering dossiers |
Project Name / Client | Salman Gas Revamping /IOOC |
---|---|
Region | Middle East |
Project | Topsides’ Equipment & Facilities of Gas Utilities, Gas Processing Platform, Accommodation Platform, Gas Wellhead Platform, Oil Gathering Platform, Gas Lift Platform, Sirri Island Facilities, Mubarak Platform |
Scope of Work | Engineering Endorsement Procurement Installation and Pre-Commissioning Commissioning and Start-up of Gas Processing |
Project Name / Client | Removal of 5 wrecks in Khor-e-Musa / TideWater |
---|---|
Region | Middle East |
Project | Removal of 5 sunken wrecks |
Scope of Work | Mobilization and Demobilization of Manpower, Equipment & Marine Spread Pre-Underwater Survey Diesel Fuel & Lube Oil Recovery Wreck Removal Post Underwater Survey 5 ship/wrecks Transportation |
This website uses cookies to ensure you get the best experience on our website.